Squamish, British Columbia
Turbidity Currents, Suspended ADCP Data 2018

Index:

Flow 01: 06/09/2018


Maximum flow velocity is around 1.5 m/s
Duration ~ 1 hour

Flow 02: 06/14/2018


Maximum flow velocity is around 0.4 m/s Duration ~ 30-40 minutes

Flow 03: 06/20/2018


Maximum flow velocity is around 2 m/s
Duration ~ 40-50 minutes

Flow 04: 06/21/2018


Maximum flow velocity is around 0.6 m/s
Duration ~ 1 hour

Flow 05: 06/22/2018


Maximum flow velocity is around 0.6 m/s Duration ~ 1 hour

Flow 06: 06/24/2018


Maximum flow velocity is around 8-10 m/s
Duration ~ 1.5 hours

Zoomed in on the first 20-30 minutes of Flow 06
Zoomed in on the first 20-30 minutes of Flow 06

Flow 07: 06/25/2018    1st Flow


Maximum flow velocity is around 0.3-0.4 m/s
Duration ~ 1 hour

Flow 08: 06/25/2018    2nd Flow


Maximum flow velocity is around 0.6-0.7 m/s
Duration ~ 1 hour

Page Created by Liam Cahill